Meadow Way Slide Repair
Description
Overview
The project involves mitigating a landslide that occurred during the 2022/2023 storm season on Meadow Way. The landslide damaged the paved shoulder, and the upper bank was eroded. The damage is about 105 feet along the roadway. The damaged portion of Meadow Way is located approximately 500 feet from the intersection of Meadow Way and Sir Francis Drake Boulevard in San Geronimo.
Funding
Estimated project cost is $600K, for which the County is pursuing FEMA reimbursement.
Public impacts
One lane alternating traffic at the slide area can be expected to accommodate the construction of the wall. The one lane alternating traffic will be controlled by a flagger on both and a marked detour route. For specific stages of the work, it will likely be necessary to close the road for several hours at a time. Once the schedule and impacts are known, public outreach will be early and often and efforts will be made to minimize public inconvenience especially around the school.
Timeline
Summer 2024
- Construction begins