Storms caused a slip out adjacent to the existing retaining wall in front of 7299 Lucas Valley Road. The County proposes to install a new retaining wall along the stretch with a rock buttress to stabilize the site and prevent future erosion.

Funding

The engineer’s estimate is $720,000 and will be funded through the Federal Highways Administration’s Emergency Relief Funds with a local match.

Traffic impacts

There will be one lane access with alternating two-way control through the single lane. Traffic delays will be limited to 5 minutes. A temporary traffic signal system will be implemented and operational during non-working hours. Traffic delays can be expected during non-working hours.

Timeline

Summer 2024

  • Expected construction phase