Fairfax-Bolinas Road in West Marin at milepost 5.73 (approximately 2 miles west of Azalea Hill) is single-lane access with two-way traffic controlled through one lane. This condition is at the construction zone only and will remain in place until project is completed. See project webpage for more details. Thank you for your patience while this project progresses.

How long does this process take?

Typically, a PRD can be formed, and a special tax placed on the ballot within 12 to 18 months. Initial road work can usually occur 6 to 12 months after the special tax passes and a loan taken out. 