Renovation of the Frank Lloyd Wright-inspired 2,000-seat Veterans’ Memorial Auditorium (VMA) began in July 2023 to conduct necessary seismic and code improvements. Having an opportunity created by the building being dark for this seismic work, investigative studies were conducted to evaluate the rest of the VMA structure.  While inspections determined that the perimeter foundation and elements...

CSA 6 AB Meeting Presentation 031324

CSA6 AB Agenda Packet 031324

CSA6 Meeting Cancellation 022724

Description Overview Storms caused two separate slip outs along Sir Francis Drake Blvd at milepost 20.97 on the eastbound lane, located between Highway 1 and Platform Bridge Road (close to the Bolinas Ridge Trailhead). The County proposes to install two new retaining walls to shore up the roadway shoulder. The County is coordinating with the...

Description Overview Storms caused an embankment failure immediately below the existing retaining wall on Marshall Petaluma Road at milepost 8.24, approximately half a mile south of Walker Creek Ranch. The County proposes to install a rip rap buttress along the slope starting from the bottom of the existing retaining wall to the slope of the...

Description Overview Storms caused a slip out adjacent to the existing retaining wall in front of 7299 Lucas Valley Road. The County proposes to install a new retaining wall along the stretch with a rock buttress to stabilize the site and prevent future erosion. Funding The engineer’s estimate is $720,000 and will be funded through...

Description Overview Due to the age and condition of the roof, the project will entail the complete replacement of the roof, including gutters and downspouts. Funding The estimated $132,000 project is funded under the County General Fund. Public impacts None Timeline February to March 2024 Construction phase

For Immediate Release - Marin County, CA - A single lane of traffic control will be in place at milepost 2.26 for about 2 months   UPDATE: Due to the storm, the closure of one lane of Panoramic Hwy has been postponed. Based on the current weather forecast, it's likely that the project will not...

For Immediate Release - Marin County, CA - Pavement Condition Index score for Marin has increased from 66 to 68 Despite the intense storms of January 2023 that heavily impacted the roadways of Marin, the Pavement Condition Index (PCI) score for County-maintained roads has increased from 66 to 68, as of December 31, 2023. PCI...

For Immediate Release - San Rafael, CA - Travelers near Mount Tamalpais to be affected by construction zone Travelers between the Mount Tamalpais area and Stinson Beach may be affected by a road construction project starting in late November and lasting into the spring of 2024. The work on Panoramic Highway will address damage from...